top of page

ISLAND ISSUES

This page lists some of the issues HIRA is working on to try and get improved

Traffic

Hayling is England's biggest island with only one bridge and only one road on and off.  That makes it especially vulnerable to traffic issues.  Any roadworks, accident, flooding, or even refuse collection or delivery lorry in the nearly 3 miles between the A27 roundabout and the roundabout at Mill Rythe can gridlock the whole island for hours at a time.  And that often extends into Havant, and onto the main A27 trunk road.

​

Unfortunately, that wasn't enough to stop even a huge planning applications such as Rook Farm's 300 houses.  We need get traffic issues into the emerging Local Plan, which will be examined by the Planning Inspectors in 2027.

​

For that to happen we need to build up a credible base of evidence to put to the Planning Inspectors.  We are working on that now, starting with the evidence we presented at the Rook Farm Planning Appeal.

​

For current incidents, check out the Facebook's Hayling Island Traffic Watch.

Flooding

No surprise for a low-lying island, flooding is a perennial problem, for roads and for properties.

In April 2024, Storm Pierrick co-incided with the spring tides, causing severe coastal flooding in Mengham and Northney, and blocking our backup road through Northney for a week.  Dozens of homes were flooded, many taking a year to rennovate, and dozens of vehicles were written off, causing damage in the millions of pounds, and putting future insurance at risk.

​

Even the approaches to the bridge are at risk of flooding, both from sea and stormwater.  Northney Road is impassable so often that the Council has installed a flooded/not flooded flap sign.  Sea water causes huge corrosion to motor vehicles, which is often not apparent for days or weeks afterwards, and can cause vehicles to be written off.

Beach erosion

Hayling's 4 miles of beach are constantly being eroded, made worse by the decision to remove many of the wooden groynes which had protected it since the 1950's.  The severe flooding of the Selsmore Road area in the 1980's has been prevented by the annual 'shingle shuffle', where shingle that migrates westward is hauled back to Eastoke to restore the beach.

​

That is a hugely expensive process, funded so far by the Environment Agency, but it's considered unsustainable in the longer term, and the Council's Coastal Partners team is working on plans for a more permanent solution.

​

West Beach is particularly badly affected, having lost huge areas of car park as the sea has washed it away.  An emergency plan to stabilise it with one or more rock groynes is in progress, but only partly funded.

bottom of page